Skip to content

Risk register template

Heat Matrix

Card-grid dashboard · Oxblood & bone · Montserrat + Lato

The full document

Download the compiled PDF
Heat Matrix — risk register template, Card-grid dashboard layout, rendered from live data

Rendered by the same engine the API runs — this is the compiled output, not a mock-up.

What happens when your data replaces the sample

What Heat Matrix does when the data is longer, shorter or emptier than the sample:

Fixed page furniture Never grows, never moves
foot rule carrying the register reference and the review date (fixed height — nothing in it may grow)
Repeats per record One block per row of your data
summary cards; matrix cells; register rows; the movement list
Grows with your data Absorbs long values without breaking
every register row's risk and mitigation; the appetite note
Pinned to every page Holds position across page breaks
the foot rule sits at the page bottom on every page
Order on the page What sits after what
the matrix and the register sit side by side under the cards; the movement strip follows them
Page breaks What may split, what must not
the register table may split across pages; each summary card, the matrix and the appetite note must not
Last page How the document ends
the movement strip may occupy the final page alone; the foot rule carries it

Palette and type

Oxblood & bone

  • Ink #4a1c24
  • Accent #8c2f39
  • Canvas #f4efe6

Montserrat + Lato

The pairing this design was drawn around, laid out as a Card-grid dashboard on A4 landscape. Either face can be swapped in the editor — the layout holds on the grid, not on a font's metrics.

Other risk register designs

All risk register templates →

Heat Matrix is the card-grid dashboard reading of this document; its siblings take it differently — minimal, type-led and swiss grid. See all risk register templates.